Trail Run Project Logo

The eastern segment of a smooth and rolling trail built in a modern and sustainable style.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

3.4

Miles

5.5

KM

99%

Runnable

989' 301 m

High

819' 250 m

Low

211' 64 m

Up

57' 17 m

Down

1%

Avg Grade (1°)

7%

Max Grade (4°)

Dogs Unknown

This trail is open to both bikes and foot traffic. Please stay alert on the trails and respect other users.
Open 30 minutes before sunrise to 30 minutes after sunset. Closed when wet and seasonally after the last thaw until the trail surface dries and hardens.

Description

The trail is generally well marked and consists of 95+% smooth and generally flat singletrack through a young eastern forest. It can be started at the lower parking area. There are many stream crossings, most with bridges. There are also a couple of sections of boardwalk trail.

Continue straight onto the Red Trail when you intersect with this trail.

Go enjoy! It doesn't get much better than this in the Cleveland area.

Contacts

Land Manager: Cleveland MetroParks

Shared By:

ESG Greene

Trail Ratings

  4.8 from 5 votes

#3034

Overall
  4.8 from 5 votes
5 Star
80%
4 Star
20%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#39

in Ohio

#3,034

Overall
2 Views Last Month
420 Since Sep 29, 2017
Intermediate Intermediate

50%
0%
25%
0%
25%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.