Trail Run Project Logo

An easy run on a former railroad grade that leads through woods, ending at the Quinebaug River.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

2.5

Miles

4.1

KM

100%

Runnable

649' 198 m

High

631' 192 m

Low

22' 7 m

Up

37' 11 m

Down

0%

Avg Grade (0°)

2%

Max Grade (1°)

Dogs Leashed

Features Birding · Fall Colors · Lake · River/Creek · Swimming · Wildlife

Description

Trail access is located at the trailheads on US 20 or Five Bridges Road. This trail follows the railroad grade of the unfinished Grand Trunk Railway (GT) which would have linked the Central Vermont Railroad to Providence RI had it been completed. From the western trailhead on US 20, the trail passes through an old tornado blowdown and parallels US 20 for the first 1/2 mile. After 1.7 miles, the trail crosses Five Bridges Road and a second access point. At 2.4 miles there is a spur loop trail with benches overlooking the Quinebaug River marsh. The trail ends at a proposed bridge site over the Quinebaug River.

Shared By:

Dan Broman

Trail Ratings

  4.0 from 4 votes

#1

in Brimfield

#11759

Overall
  4.0 from 4 votes
5 Star
25%
4 Star
50%
3 Star
25%
2 Star
0%
1 Star
0%
Trail Rankings

#1

in Brimfield

#124

in Massachusetts

#11,759

Overall
20 Views Last Month
3,561 Since Dec 24, 2016
Easy Easy

67%
33%
0%
0%
0%
0%

Photos

A quick detour around the Marsh View Loop Spur makes for a great addition to any morning jaunt.
Dec 24, 2016 near Holland, MA
The Quinebaug River from the Grand Trunk Trail.
Dec 24, 2016 near Holland, MA
Looking down the old railroad grade.
Dec 24, 2016 near Holland, MA

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.